We effectively have three separate slabs -- the basement floor, the garage floor, and the front porch. They decided to do only two of the three at this point.
They decided that the front porch slab would be best if poured after the framers have the first flooring system installed. I'm not sure how that's going to work with gettin my loan draw for foundation work, and squeezing in the slab pour while the framers are on site, but they assure me this is will result in the best quality porch.
This should prove to be an interesting and fast paced week for our new home.