Slabbed

Monday, September 20, 2010

Well, they started two days later than we had planned, but Friday, they brought out the pump truck and started pouring slabs.




We effectively have three separate slabs -- the basement floor, the garage floor, and the front porch. They decided to do only two of the three at this point.




They decided that the front porch slab would be best if poured after the framers have the first flooring system installed. I'm not sure how that's going to work with gettin my loan draw for foundation work, and squeezing in the slab pour while the framers are on site, but they assure me this is will result in the best quality porch.

This should prove to be an interesting and fast paced week for our new home.

1 comment:

Laura Bush said...

I am grateful that I was able to learn something useful from this article. After reading it, I believe you possess excellent expertise about raised loft floor Thank you for sharing that. Keep up the good work.

Post a Comment

Unless otherwise indicated, all images and other content located on this site are the property of
Eric C. Willman © copyright 1994-2010, all rights reserved.
| Next Blog»    |  
Eric C. Willman